|
||||||||||||||
Repair Log - Shift Linkage Bushings |
||||||||||||||
CB77 | ||||||||||||||
![]() |
||||||||||||||
CB77 | ||||||||||||||
Step 1: drill. Step 2: fit bushings. Step
3: pay the machine shop $60.00 The pivot bolt "A" was machined down to correspond to the ID of the fitted shift pedal bushing "B." Bronze bushings "C" were fitted to accept the new link pin "D" where it holds the shift linkage arms "E" on each end. |
||||||||||||||
|